Barndominium Builders in Cherry Hill, New Jersey
Cherry Hill is a built-out suburban township, so a barndominium here usually goes on a lot cleared of an older house or on one of the few larger lots left, not clearing a field. That changes the order of work. Before any frame, the Township of Cherry Hill wants a zoning permit from its Department of Community Development, and the construction office will not take a new-dwelling application without that and a handful of other prior approvals: a sewer connection permit from the Camden County Municipal Utilities Authority, soil conservation district sign-off or an exemption letter, and county health approval if the lot is on a septic system or a well. We build barndominium-style homes, shouses and steel-framed houses sized for suburban lots, from shell packages to turnkey builds, and we plan the elevations so the house reads well on a residential street. For buyers comparing barndominium builders near Cherry Hill, the lot usually decides the design: its zone sets the minimum size, the setbacks and a 35-foot height limit in its RA and R1 districts. If you have a lot in mind, send us the details and we will read it against the township's zoning ordinance before anyone draws a plan.
Cherry Hill at a glance
- Township
- In Camden County
- Construction permit
- Municipal construction office
- Wastewater
- Public sewer
- Local facts on this page
- 5, each linked to its source
Before you build in Cherry Hill
The local answers that shape a build here, each taken from the office or document that publishes it. Rules change, so we confirm them again against your parcel before drawing.
Township of Cherry Hill, Department of Code Enforcement and Inspections (construction code official)
The township's Department of Code Enforcement and Inspections makes sure all construction work in Cherry Hill complies with the Uniform Construction Code and issues construction permits after plan review. A new house reaches that office only after the Department of Community Development approves a zoning permit, which the township forwards to the construction office when building permit review applies.
Source: Building Inspection & Code, Cherry Hill Township (chnj.gov)
Camden County Municipal Utilities Authority (sewer connection permit), with Cherry Hill's local sewer lines
The township's residential submittal checklist asks every new dwelling for a sewer connection permit from the CCMUA before the construction permit. A lot that still needs a septic system or a private well instead goes to the Camden County Department of Health for approval, the same checklist says.
Source: Submittal Requirements for New One- and Two-Family Dwellings, Cherry Hill Department of Code Enforcement and Inspections (chnj.gov)
- Prior approvals for a new house
- Cherry Hill's residential submittal requirements (revised September 6, 2022) list the prior approvals for a new dwelling: Community Development approval for zoning and planning board requirements; a CCMUA sewer connection permit; approved plans or an exemption letter from the Camden County Soil Conservation District; and county health approval for any septic system or well.
- Zoning permit comes first
- The township requires a zoning permit for new homes and most other construction, filed with the Department of Community Development at 820 Mercer Street; approved zoning permits go to the applicant and, where applicable, on to the construction office for building permit review.
- Residential Agriculture zone
- Article IV of the Cherry Hill zoning ordinance (as of November 2022) creates a Residential Agriculture (RA) zone for low-intensity farming and single-family dwellings on large lots. Single-family detached homes are a permitted use, horses are a listed accessory use, the minimum lot is 1 acre and the height limit is 35 feet.
- R1 single-family lots
- In the R1 Residential zone, intended for single-family detached dwellings at low density, the same ordinance sets a minimum lot of 13,000 square feet for an inside lot and 15,000 for a corner lot, with a 35-foot height limit. The township notes the November 2022 ordinance has later amendments still being folded into the document.
- Construction office on the state roster
- The Department of Community Affairs' listing of municipal construction code enforcement officials, dated September 2, 2026, shows Cherry Hill Township, Camden County, with its own construction official and building, electrical, plumbing and fire protection subcode officials at 820 Mercer Street.
Source: Submittal Requirements for New One- and Two-Family Dwellings, Cherry Hill Department of Code Enforcement and Inspections (chnj.gov)
Source: Zoning, Cherry Hill Township (chnj.gov)
Source: Article IV, Zoning Regulations, Cherry Hill Township Zoning Ordinance (chnj.gov)
Source: Zoning Ordinance, Cherry Hill Township (chnj.gov)
Source: Listing of Municipal Construction Code Enforcement Officials as of September 02, 2026, New Jersey Department of Community Affairs (nj.gov)
Land and lots in Cherry Hill
Open land in Cherry Hill is limited: the township is mostly developed neighbourhoods, and new single-family building tends to happen on infill lots or where an older house comes down. The R1 zone's 13,000-square-foot minimum is enough for a compact one-storey barndominium with an attached garage. The Residential Agriculture zone, with one-acre minimum lots and horses allowed as an accessory use, is where a larger footprint or a shop bay has room. Check the township's interactive zoning map for the parcel's district first. For bigger acreage, a pole barn home or a working shop, the Camden County page covers the county's eastern townships and Gloucester County has the nearest farm country.
Where we build in this part of New Jersey
Camden, Cherry Hill, Vineland & South Jersey
Barndominium kits and plans for Cherry Hill
A kit package, a custom plan or a turnkey build. The parcel decides the budget more than the floor area does, so we price against your land rather than a rate card.
Barndominium Kits
Barndominium kits and prefab shell packages for New Jersey land, sized to the snow and wind values for your exact site and the state's frost depth.
Custom Plans
Custom barndominium plans for New Jersey: a concept layout fitted to your lot, then a permit set sealed by a New Jersey-licensed professional.
Turnkey Builds
Turnkey barndominiums in New Jersey: land checks, approvals, septic, well, frame and finishes under one contract, through to the certificate of occupancy.
Have land in Cherry Hill, or a parcel in mind? Tell us about it and what you want to build, and we will check it against the local rules before anything is drawn.
Building in Cherry Hill: questions
Start the surveyHow much does a barndominium cost to build in Cherry Hill?
Do I need a building permit for a barndominium in Cherry Hill?
Can I keep horses with a barndominium in Cherry Hill?
Which approvals come before the construction permit in Cherry Hill?
Keep reading
What usually comes next once you know what Cherry Hill allows.
Barndominium Cost Guide
Third-party cost ranges by build type and size, and what moves the number on your land.
Read itIs a Barndominium Legal in New Jersey?
Zoning, septic and who inspects, before you buy the land.
Read itHow Long Does It Take?
From parcel to move-in, and which steps set the clock.
Read itSources for this page
The published pages behind the Cherry Hill facts above. Rules change, so check the current version with the office before you rely on it.
- Building Inspection & Code, Cherry Hill TownshipConstruction permit authoritychnj.gov
- Submittal Requirements for New One- and Two-Family Dwellings, Cherry Hill Department of Code Enforcement and InspectionsWater and sewer; Prior approvals for a new housechnj.gov
- Zoning, Cherry Hill TownshipZoning permit comes firstchnj.gov
- Article IV, Zoning Regulations, Cherry Hill Township Zoning OrdinanceResidential Agriculture zonechnj.gov
- Zoning Ordinance, Cherry Hill TownshipR1 single-family lotschnj.gov
- Listing of Municipal Construction Code Enforcement Officials as of September 02, 2026, New Jersey Department of Community AffairsConstruction office on the state rosternj.gov
Other New Jersey locations close by
Across a municipal line the construction office, zoning and health agency can all change, so each place has its own page.
Building in Cherry Hill?
Start with the survey. Tell us where the land is and what you want on it, and we will come back with which offices approve it, what the lot will allow, and a plan to fit.